Project

2T Demag Semi goliath crane system

Installed to cover a new metal processing machine whilst still allowing the two main 10T overhead cranes to travel the full length of the factory. Zoning safety limits fitted to all 3 cranes to prevent the overhead cranes from hitting the new crane.